
S13 E824 October 1991★ 0.0 TMDB
The Wayland House - 8
Season 13
Episode 8 of 26
Protected until you decide
Episode overview
Our master carpenter completes the radius frame for the front portico deck, while our general contractor reviews the new engineered wood framing for the kitchen and master bath. Excavator Herb Brockert begins digging the leaching field for the new septic system. Asbestos is removed from pipes in the basement.
The overview may reveal episode details
The room
Log in to join the conversation.
Log inNo comments in this episode room yet. Be the first to say something.
S13 E8 · The Wayland House - 8This Old House
Sign in to track