
The Watertown House - 8
Season 20
Episode 8 of 26
Protected until you decide
Episode overview
A Dig Safe representative is on site to explain the nonprofit organization's function: to notify all utilities of impending excavation so that they can mark buried lines. Out back, Roger Cook and crew remove topsoil to begin the digging of a massive drywell that will hopefully control the water that drains from surrounding yards onto the property during rainstorms. The team review the extensive termite damage to the front sill; to replace it, they need to jack the balloon-framed wall above it - no easy task, since the floors are not really attached to the wall studs in this type of construction. Meanwhile, Christian and our host take a tour through the mocked-up kitchen, where Christian is asked a few pointed questions about the design.
The overview may reveal episode details
The room
Log in to join the conversation.
Log inNo comments in this episode room yet. Be the first to say something.