Moving from TV Time? Keep your original dates and rewatches.Import free
Beta. This product is in beta — features and design are still changing.
Back to This Old House
S27 E53 November 2005★ 0.0 TMDB

Cambridge | The Cost of Poor Workmanship

This Old House · Season 27

Season 27

Episode 5 of 26

All episodes

Protected until you decide

Episode overview

Master carpenter Norm Abram shows Host Kevin O'Connor the newly discovered problems at the project house, most of them caused by the poor workmanship of a previous contractor. In the living room, one structural fix is already underway as general contractor Tom Silva prepares to install a flush frame beam made from LVLs that will carry the load of the second floor. Pest management expert Dan Fleicher shows Kevin the extent of the termite and carpenter ant damage, and suggests possible treatment options. Landscape contractor Roger Cook reveals the anatomy of new landscape walls; they'll be natural stone veneer over reinforced concrete. Kevin visits Six Moon Hill, a utopian neighborhood of modern houses created by The Architects Collaborative in 1948. Plumbing and heating expert Richard Trethewey shows Kevin one of the challenges he's facing in this minimalist modern house — no place to hide necessary ductwork.

The overview may reveal episode details

The room

Log in to join the conversation.

Log in

No comments in this episode room yet. Be the first to say something.

S27 E5 · Cambridge | The Cost of Poor WorkmanshipThis Old House
Sign in to track